Samsung Food
Samsung Food is a recipe and meal planning app with a large daily audience, where I was Lead Product Designer. These eight case studies cover meal planning, recipes and health.
Every designer on the team adopted the iteration and review process I introduced, down to the page format in Figma and the review format. I also set up the process for updating and creating design system components. The meal cards, the goals sheet, the progress chart and the rings from these studies became components other squads built with.

01Four case studies
Meal planning
The Tailored Plan and the planner around it.
- 2025 Tailored Plan Moving the planner from an empty state to a prepopulated weekly plan.
- 2024 Swap Meals in the Tailored Plan Scope negotiated with engineering down to a randomised swap in place, free for all users.
- 2024 Casual Meal Planner A to-do list mode in the planner for users who plan casually.
- 2024 Planner Improvements Five planner briefs, including notes, personalised servings and leftovers, each taken to handover.
02Two case studies
Recipes
Adapting recipes to the way a user eats, first by ingredient and then with AI.
- 2023 Ingredient Substitutions Ingredient swaps on any recipe, for Basic, Beta and Premium users.
- 2023 Recipe AI Generative tweaks that convert any recipe, released in Beta and then in Samsung Food+.
03Two case studies
Health
Nutrition goals and weekly progress from the data users enter.
- 2023 Health Goals The health profile, the recommendations tailored to it and nutrition targets in a rebuilt planner, released by consent and tier.
- 2024 Health Dashboard The first health dashboard, released as hard metrics, and the trends work designed on planned meals after it.
Contact
Get in touch
Product design lead across research, design systems and handover, with coding agents in the loop. Contract, outside IR35, or a permanent lead role.
- Available
- Now
- Location
- London, remote or hybrid, UK and EU
- Right to work
- UK settled status, EU citizen
- RolesLead Product Designer, Principal Product Designer, Design Engineer
- Experience10+ years
- ScopeResearch, design systems, prototyping, handover, QA with agents
- LanguagesEnglish, Italian, Spanish
- Email[email protected]
- LinkedInlinkedin.com/in/dariocodipietro
Professional profile
Copy into your coding agentSkills
- Product design, end to end
- UX and interaction design
- Visual design and motion
- Prototyping in Figma and code
- Design systems at scale
- User research and testing
- A/B testing and analytics
- Strategy and discovery
- AI product design
- Design to code, with agents
- Accessibility, WCAG 2.2 AA
- Leadership and mentoring
Platforms
iOS, Android, responsive web, smart TV and connected devices
Sectors
- AI products
- B2B SaaS
- Consumer apps
- Streaming, media and sport
- Health, wellness and food
- Legal tech
- Telecoms and utilities
Tools
- Figma
- FigJam
- Figma Make
- Claude Design
- Framer
- Axure RP
- Storybook
- Claude Code
- Cursor
- Codex
- MCP
- GitHub
- Linear
- Jira
- Confluence
- Notion
- Miro
- Prolific
- Lyssna
- Maze
- PostHog
- Amplitude